2016-17 Building Improvements
In our first two years, Bayfront sub-leased classroom space from United States University. Soon, it was evident that the building wasn't big enough for two schools, and in April of 2016, we were granted permission to take over the lease for the entire building.
Bayfront Charter High School took over in July of 2016-- just in time to welcome our third 9th grade class. However, there was much work to be done to ensure our building was comfortable for 150 more students. Thanks to the generosity of Carleton Management-- our building owner-- we were able to dramatically improve fire safety features, campus security, traffic flow, and of course, our learning spaces.
Below are BEFORE-DURING-AFTER photos from around our school!
Bayfront Charter High School took over in July of 2016-- just in time to welcome our third 9th grade class. However, there was much work to be done to ensure our building was comfortable for 150 more students. Thanks to the generosity of Carleton Management-- our building owner-- we were able to dramatically improve fire safety features, campus security, traffic flow, and of course, our learning spaces.
Below are BEFORE-DURING-AFTER photos from around our school!
The Student Lobby
In The Lobby...Student Collaboration Pods
Our First Mural
And our student-artists created this awesome centerpiece...